I think I am putting too big of a resposibility load on myself by trying to report weekly. Every time I head home from work during the week I tell myself, "You need to put in the painting time!" Yet I am mentally exhausted by the time I get home and only the looming weekly deadline time makes me panic even more. I've also been catching up on several major house issues, so my BIHPOM time (pronounced BISH-POM and means "Brush In Hand, Paint On Miniature", go read See Mark Paint) has been difficult to say the least.
I have managed to get the current Team Banzai inventory of 25 miniatures all up to Detail Painted, and even started applying paint to the dozen 1st Davion Guards to move them to the same milestoone. I also got a repair in as well. Once I figure out what I want to get for the last eleven 'Mechs for Team Banzai, plus the last eight vehicle miniatures for the 101st Irregulars, that will give me an easy boost.
I am also shifting the reporting here to monthly. I have 57 weeks left to go, I don't want to flood my feed (and you) with that many posts on the same subject. So, until I get this done, the first Monday of every month will be "report day."
Here's the numbers. My current Par is +53:
Days left: | 404 | ||
Steps from last report: | 1154 | ||
Steps left: | 1147 | ||
Units in | Weekly | Delta: | 7 |
this stage | Delta | Current status: | On-Track |
126 | 1 | Ready | 38.9% |
14 | -1 | Repair | 4.3% |
0 | 0 | Garnish | 0.0% |
0 | 0 | Sealed | 0.0% |
1 | 0 | Dipped | 0.3% |
30 | 6 | Detail Painted | 9.3% |
73 | -6 | Base painted | 22.5% |
25 | 0 | Basecoated | 7.7% |
0 | 0 | Unpainted | 0.0% |
0 | 0 | Unassembled | 0.0% |
55 | 0 | Unpurchased | 17.0% |
I get four days off this week due to Thanksgiving, I hope I can get a lot done then.